Establishment of Answer Period: PJM Interconnection, LLC; AEP Appalachian Transmission Co., Inc.; AEP Indiana Michigan Transmission Co., Inc.; et al.
Details
The document's own metadata, straight from the source system.
- Title
- Establishment of Answer Period: PJM Interconnection, LLC; AEP Appalachian Transmission Co., Inc.; AEP Indiana Michigan Transmission Co., Inc.; et al.
- Posted
- Aug 4, 2026
- Comment period
- Aug 4, 2026 – ?
- FR Doc
- 2026-15779
Overview
What the public is saying — stance, who's commenting, and the issues they raise.
Stance breakdown
Who commented
Breakdown by commenter type.
Comments over time
Weekly arrivals, stacked by stance.
Support × commenter type
How each type splits across stance.
Issues raised
The docket's canonical issues. Select one to browse its comments.
Issues are identified as comment analysis progresses — nothing tagged on this document yet.
Explorer
Every mirrored comment — filter by stance, campaign, or issue.
- Jul 15, 2026Relentless Energy Systems LLCAnalysis pending📎 AttachmentRead comment →
- Jul 8, 2026MAVEN SOLUTIONSSupportBusiness📎 Attachment
Maven Solutions, a decision-intelligence practice, argues that PJM's current tariff posture on large-load interconnection is inadequate and scores "Conditional" under their Civic Bankability Rating Standard. They recommend that the Commission require PJM to submit specific tariff revisions to improve transparency, cost-causation methodology, and reliability-hold-harmless mechanisms.
Read comment → - Jul 8, 2026MAVEN SOLUTIONSSupportBusiness📎 Attachment
Maven Solutions, a decision-intelligence practice, argues that PJM's current tariff posture on large-load interconnection is inadequate and scores "Conditional" under their Civic Bankability Rating Standard. They recommend that the Commission require PJM to submit specific tariff revisions to improve transparency, cost-causation methodology, and reliability-hold-harmless mechanisms.
Read comment → - Jul 8, 2026Global Capacity AllianceSupportAdvocacy📎 Attachment
The Global Capacity Alliance (GCA), a nonprofit association, is requesting intervenor status to advocate for a "Front-of-the-Meter (FTM) Netting" framework. They argue that this framework allows large loads (like data centers) to privately mitigate curtailment risks through co-located resources, improving grid visibility and reliability without requiring ratepayer subsidies.
Read comment → - Jul 9, 2026L MeltonSupportIndividual📎 Attachment
Lisa Melton, filing as L.M. Marlowe, is a private citizen and independent researcher who supports the proposed action by providing technical specifications for grid reliability and cost allocation. She argues for a rigorous evaluation of large-load integration based on physical stability, observability, and cost-causation standards.
Read comment → - Jul 9, 2026E PierceSupportBusiness📎 Attachment
New Era Energy & Digital Inc., a data center developer, is requesting to intervene in the proceeding to provide comments on PJM's transmission tariff. They argue that PJM should adopt a "Maximum Net Withdrawal" framework for large loads paired with nearby generation and include fast-track processes for safe supply additions like uprates and reactivations in its resource-adequacy report.
Read comment → - Jul 8, 2026L MeltonSupportIndividual📎 Attachment
Lisa Melton (filing as L.M. Marlowe) is an independent researcher and private citizen who supports the Commission's efforts to address reliability and cost-allocation issues regarding large computational loads. She proposes a specific "boundary-verification" framework to ensure grid stability and cost-causation without requiring access to the proprietary internal operations of data centers.