Institution of Section 206 Proceeding and Refund Effective Date: California Independent System Operator Corp., Citizen S-Line Transmission LLC, Citizens Sunrise Transmission LLC, et al.
Details
The document's own metadata, straight from the source system.
- Title
- Institution of Section 206 Proceeding and Refund Effective Date: California Independent System Operator Corp., Citizen S-Line Transmission LLC, Citizens Sunrise Transmission LLC, et al.
- Posted
- Jun 24, 2026
- Comment period
- Jun 24, 2026 – ?
- FR Doc
- 2026-12703
Overview
What the public is saying — stance, who's commenting, and the issues they raise.
Stance breakdown
Who commented
Breakdown by commenter type.
Comments over time
Weekly arrivals, stacked by stance.
Support × commenter type
How each type splits across stance.
Issues raised
The docket's canonical issues. Select one to browse its comments.
Issues are identified as comment analysis progresses — nothing tagged on this document yet.
Explorer
Every mirrored comment — filter by stance, campaign, or issue.
- Jul 15, 2026Relentless Energy Systems LLCAnalysis pending📎 AttachmentRead comment →
- Jul 8, 2026Global Capacity AllianceSupportAdvocacy📎 Attachment
The Global Capacity Alliance (GCA), a nonprofit association, is requesting intervenor status to advocate for a "Front-of-the-Meter (FTM) Netting" framework. They argue that this framework allows large loads (like data centers) to privately mitigate curtailment risks through co-located resources, improving grid visibility and reliability without requiring ratepayer subsidies.
Read comment → - Jul 9, 2026L MeltonSupportIndividual📎 Attachment
Lisa Melton, filing as L.M. Marlowe, is a private citizen and independent researcher who supports the proposed action by providing technical specifications for grid reliability and cost allocation. She argues for a rigorous evaluation of large-load integration based on physical stability, observability, and cost-causation standards.
Read comment → - Jul 8, 2026L MeltonSupportIndividual📎 Attachment
Lisa Melton, an independent researcher and private citizen, supports the Commission's efforts to address reliability and cost-allocation issues regarding large computational loads. She proposes a specific "boundary-verification" framework to ensure grid stability and cost-causation without requiring access to proprietary internal data.
Read comment → - Jun 29, 2026L MeltonSupportIndividual📎 Attachment
Lisa Melton (L.M. Marlowe), an independent author and developer of a stability framework, supports the Commission's consideration of cost-allocation methodologies that assign reliability burdens to the specific loads that cause them. She argues that current structures unfairly socialize costs onto residential and small-commercial ratepayers and notes her proprietary interest in the diagnostic framework.
Read comment →
